Ceramics Plant - Process Piping
Georgia
The scope of this project
included installation of 4,200 ft of process piping, including
setting and alignment of mechanical equipment. The piping systems
were carbon, stainless steel, copper tubing and HDPE. The systems
included all utilities and process systems. Pressure rating for these
systems ranged from atmospheric to 600psi operating pressure.